This project acceptance document establishes formal acceptance of all the deliverables for the (Project Name) project. The (Project Name) project has met all the acceptance criteria as defined in the requirements document and project scope statement. A project audit has been performed to verify that all deliverables meet performance and product requirements. Additionally a product evaluation has been performed and determined that all products meet the quality and functional requirements defined within this project.
Transition to Operations has been completed. The live system has been handed over to Operations and the transfer of knowledge from the Project Team to Operations has also been completed. All training has concluded and the System Operations Guide has been handed over to Operations.
The Project Manager is authorized to continue with the formal close out of this project. The closeout process will include a post-project review, documentation of lessons learned, release of the Project Team, close out all procurements and archive all relevant project documents. Once the closing process is completed the Project Sponsor will be notified and the Project Manager will then be released from the project.
Sponsor Acceptance
Approved by the Project Sponsor:
__________________________________________ Date:____________________
(Project Sponsor Name)
(Project Sponsor Title)